1 |
An automatic tool/machine to do the multiple holes chamfering at a time is desirable. |
Automation |
It would help to save the multiple machines operation cost and would also eliminate the repetitive work for many operators. |
Shree Pressing pvt.Ltd. L-15 MIDC Waluj |
MARATHWAD INSTITUTE OF TECHNOLOGY.AURANGABAD |
Prof. Mrs. V S Deshmukh |
Ms. Rupali A. Chavan, Ms. Archana Tupe
|
2 |
Autmatic transfer system for blanks movement between different stages. |
AUTOMATION |
Autmatic transfer system for blanks movement between different stages. |
Shree Pressing pvt. Ltd. L-15 MIDC Waluj |
MARATHWAD INSTITUTE OF TECHNOLOGY.AURANGABAD |
Prof. Ms. P Priyadarshni |
Mr. Pawan Darekar, Mr. Sham Khandey
|
3 |
Development of progreessive die. |
MECHANISATION |
INCREASE IN PRODUCTIVITY |
Shree Pressing pvt. Ltd. L-15 MIDC Waluj |
MARATHWAD INSTITUTE OF TECHNOLOGY.AURANGABAD |
Prof. Mrs. V S Deshmukh/ Prof. Sandeep Pankade |
Ms. Snehal Patil, Ms. Manali Gawai, Ms. Apoorva Giri |
4 |
An automatic Camera system to check all the parts visually in auto mode. The system must able to catch the burrs, scratch marks and dents of surface. It should have a provision to identify OK and Not Ok parts. |
AUTOMATION |
Identify OK and Not Ok parts |
Shree Pressing pvt. Ltd. L-15 MIDC Waluj |
MARATHWAD INSTITUTE OF TECHNOLOGY.AURANGABAD |
Prof. V S Dhamdar |
Mr. Yashodhan Mahale, Mr. Akshay adhe |
5 |
Design and development of proper storage and retrieval system for pipes |
MECHANISATION |
Design and development of proper storage and retrieval system for pipes. |
Acreete Auto, H-26, MIDC Waluj |
MARATHWAD INSTITUTE OF TECHNOLOGY.AURANGABAD |
Prof S R Gaikwad |
Mr. Vaibhav Shimpi, Mr. Vivek Mogal |
|
6 |
Study and analysis of Co2 welding parameters in order to reduce spatters. |
ANALYSYS |
Reduce spatters |
Acreete Auto, H-26, MIDC Waluj |
MARATHWAD INSTITUTE OF TECHNOLOGY.AURANGABAD |
Prof. N S Deshmukh |
Mr. Yuvraj Dalal, Mr. Ganesh Bade |
7 |
Study and analysis of lean implementation at SME via change in plant layout. |
ANALYSYS |
Study and analysis of lean implementation at SME via change in plant layout. |
Keshav Metal Pvt Ltd, M-121, MIDC Waluj |
MARATHWAD INSTITUTE OF TECHNOLOGY.AURANGABAD |
Prof. Mandar kulkarni |
Mr. Akshay Khatane, Mr. abhishek Giri |
8 |
Development of progressive die for metal shield and mounting brMECHANISATIONacket. |
MECHANISATION |
Development of progressive die for metal shield and mounting bracket. |
Bhardwaj Indutsries, Waluj |
MARATHWAD INSTITUTE OF TECHNOLOGY.AURANGABAD |
Prof. M D Gaikwad |
Mr. Akshay kere, Mr. Amol Patil |
9 |
Development of progressive die for mounting bracket |
MECHANISATION |
Development of progressive die for mounting bracket |
Bhardwaj Indutsries, Waluj |
MARATHWAD INSTITUTE OF TECHNOLOGY.AURANGABAD |
Prof. M D Gaikwad/ Prof Sandeep Pankade |
Mr. Amar Zalte, Mr. Sachin Panchal |
10 |
Design and development of Low cost automation for projection welding process of clip and nut. |
MECHANISATION |
Design and development of Low cost automation for projection welding process of clip and nut. |
Bhardwaj Indutsries, Waluj |
MARATHWAD INSTITUTE OF TECHNOLOGY.AURANGABAD |
Prof. V A Kane |
Ms. Prachi Kendrekar, Ms. Suchita Ingale |
11 |
Improvement of forming die life. |
MECHANISATION |
INCREASE IN PRODUCTIVITY |
Bhardwaj Indutsries, Waluj |
MARATHWAD INSTITUTE OF TECHNOLOGY.AURANGABAD |
Prof. V S Dhamdar |
Mr. Atharva Pathak Mr. Sagar Modale |
12 |
Analysis of process and development of appropriate fixture for welding process . (On Kirpekar machine) |
ANALYSYS |
Analysis of process and development of appropriate fixture for welding process . (On Kirpekar machine) |
Dhananjay Auto Parts unit 2,H-45, MIDC Waluj |
MARATHWAD INSTITUTE OF TECHNOLOGY.AURANGABAD |
Prof. P D Bhatkar |
Mr. Roshan Khairnar, Mr. Tanmay Kulkarni |
13 |
Design and development of cost effective material handling system in order to eliminate the component counting process. |
MECHANISATION |
Eliminate the component counting process |
Sarves Engineering, 30, Suvarna Laghu Udyog Yojna , MIDC , Waluj |
MARATHWAD INSTITUTE OF TECHNOLOGY.AURANGABAD |
Dr. V B Pansare |
Mr. Akash Pawar, Mr. Neel Sanap |
14 |
Study and implement lean principles for productivity improvement of forging process and machining activities. |
PRODUCTION |
productivity improvement of forging process and machining activities. |
Kirdak Aut Comp, M-164, Waluj |
MARATHWAD INSTITUTE OF TECHNOLOGY.AURANGABAD |
Prof N R Chavada |
Ms. Apoorva Bagul, Mr. Pranav Kulkarni |
15 |
Design and development of cost effective material handling system in order to ease the component counting process to save manpower and time. |
MECHANISATION |
save manpower and time |
Jay Enterprises, A-73, MIDC Shendra/Swagati Engieering, Chikalthana |
MARATHWAD INSTITUTE OF TECHNOLOGY.AURANGABAD |
Prof. Shon Patil/ Dr. P U Zine |
Mr. Akshay Swami, Mr. Dhanraj Bomble |
16 |
Design and development of adequate heat treatment cycle to improve the wear resistance of thread rollers for achieving higher productivity. |
MECHANISATION |
INCREASE IN PRODUCTIVITY |
Jay Enterprises,A-73, MIDC Shendra/Swagati Engieering,Chikalthana |
MARATHWAD INSTITUTE OF TECHNOLOGY.AURANGABAD |
Prof. P V Kulkarni |
Mr. Zeeshan Ahmed, Mr. Rushikesh Sonawane |